BP is planning to cut the crude capacity at the 254kbpd Gelsenkirchen from 2025 to 160kbpd, BP said in a statement.
Find more articles and bullets on these widgets:
+5,000 TUH4 102-11.12, through 102-10.88 post time offer at 1050:00ET, DV01 $191,000. Contract trades 102-10.88 last (-6.25)
DUH4 106.20/106.40/106.50/106.70 call condor bought for 1.5 in 20k