See LNG Weekly Summary Here: US_LNG_Weekly_2025-10-03.pdf
US LNG filings were busy the last two weeks, with several facilities progressing forward. Port Arthur Phase 2’s positive FID brings the total capacity that is under construction or FID’d in the US to 15.6 Bcf/d by 2030.
Find more articles and bullets on these widgets:
$17.05B to price Wednesday - well off Tuesday's record high of $50.95B, with details from a handful of names yet to announce:
EURGBP traded higher Tuesday, resulting in a breach of resistance at 0.8674, the Aug 25 and 29 high. The break signals a stronger reversal and suggests scope for climb towards 0.8744, the Aug 7 high. Key resistance and the bull trigger is at 0.8769, the Jul 28 high. Key support to watch lies at support at 0.8597, the Aug 14 low. Clearance of this level is required to reinstate the recent bearish threat.
