Freeport LNG will likely resume full operations at three trains in early August according to a Platts source.
- The terminal is expected to run Train 3 at full rate by the end of July, with Train 1 and Train 2 restarting gradually.
- Freeport LNG loadings resumed this week, adding support for U.S. natural gas prices after the Beryl closure led to around 10 cancelled cargoes through August.